Owner : Ministry of Water at Qassem
SCOPE OF WORK : Tunneling work for line Dia. 1800mm,
Length 2,880m
Size : open cut work for line Dia. 1800mm, Length 1,360m
Size : Shafts work Inner diameter 9.0 m depth from 0 up to 20 m
Total bed value : SAR 51,307,777.00
Project duration : 36 Months