Projects

Owner                       :           Ministry of Water at Qassem

SCOPE OF WORK        :        Tunneling work for line Dia. 1800mm,

Length 2,880m

Size                          :           open cut work for line Dia. 1800mm, Length 1,360m

Size                          :           Shafts work Inner diameter 9.0 m depth from 0 up to 20 m

Total bed value          :           SAR 51,307,777.00

Project duration         :           36 Months