Projects

Owner                       :         Ministry of Water at Qassem

SCOPE OF WORK        :        Tunneling work for line Dia. 2400mm,

Length 11,570m

Tunneling work for line Dia. 2800mm, Length 10,011m

Shafts work Inner diameter 13.0 m depth from 15 m up to 55 m

Total bed value               :         SAR 492,275,430.00

Project duration    :         48 Months