Owner : Ministry of Water at Qassem
SCOPE OF WORK : Tunneling work for line Dia. 2400mm,
Length 11,570m
Tunneling work for line Dia. 2800mm, Length 10,011m
Shafts work Inner diameter 13.0 m depth from 15 m up to 55 m
Total bed value : SAR 492,275,430.00
Project duration : 48 Months