Name of Project : HGDP DOWNSTREAM PIPELINES / HDAKHCL-1 CONDENSATE PIPELINES
Client / Owner : Saudi Aramco
Main Contractor : Tekfen Construction & Inst. Co. Inc. / Technip Saudi Arabia Ltd. Method : Micro Tunneling (MT)
Pipe Size : Ø24”, Ø36”, Ø48” & Ø56”
Total Length : 2 KM.
Total Est. Contract Value: SAR 5,180,000.00