Name of Project : MEW, CONTRACT – C3, SUBIYA WATER DISTRIBUTION SCHEME (STAGE 1), DUCTILE IRON PIPES & CABLE DUCTS SUBIYA WDC TO MUTLA HIGH WDC (KUWAIT)
Client / Owner : Ministry of Water Works
Main Contractor : Yenigun – ACK Joint Venture
Method : Pipe Jacking (PJ)
Pipe Size : Ø500 mm, Ø1150 mm & Ø1600 mm Concrete Sleeve Pipes
Total Length : 456 m
Year : 2005
Total Est. Contract Value : SAR 1,801,660.00