Projects

Name of Project : MEW, CONTRACT – C3, SUBIYA WATER DISTRIBUTION SCHEME (STAGE 1), DUCTILE IRON PIPES & CABLE DUCTS SUBIYA WDC TO MUTLA HIGH WDC (KUWAIT)


Client / Owner : Ministry of Water Works


Main Contractor : Yenigun – ACK Joint Venture


Method : Pipe Jacking (PJ)


Pipe Size : Ø500 mm, Ø1150 mm & Ø1600 mm Concrete Sleeve Pipes


Total Length : 456 m


Year : 2005


Total Est. Contract Value : SAR 1,801,660.00